This $21-million, 65,000-sq-ft building celebrates Gloucester’s maritime history. The steel and light-gauge metal frame construction includes solar panels, electric car chargers, cogeneration power systems, and polished concrete floorings that eliminate floor coverings and adhesives. Since the water table is exceedingly high, the team designed a single well point system to assist with continuous groundwater pumping. It employed a three-pump system, including a backup pump, so the underground plumbing, lower foundation walls, and the slab on grade could be installed. Amr Raafat, our Chief of Innovation, and the Virtual Design and Construction (VDC) team performed weekly site scans and drone mapping to capture the progress in order to remain on schedule while providing the stakeholders with weekly updates.
Merit Sports/Entertainment: Glen T. MacLeod Cape Ann YMCA
Join Our Team
Highly collaborative, talented, and passionate employees are essential to our success. With projects spanning multiple market sectors, Windover offers diverse career opportunities both in the office and in the field.